Custom copper cooling manifolds · East-coast Australia

Large-bore copper headers for liquid-cooled data centres.

Design, fabrication, supply, installation and rack connection. Brazed copper flow and return headers for direct-to-chip and rear-door cooling — hydrostatically tested, built to your floor plan rather than a catalogue.

Why liquid cooling

Air has run out of headroom.

Rack densities have climbed past the point air can carry the heat away. Liquid cooling is now the default for high-density and AI infrastructure — and it only works if the water reaches the rack.

A single AI training rack can draw 40, 80, even past 100 kilowatts. No practical volume of moving air carries that away quietly or cheaply. Direct-to-chip cold plates and rear-door heat exchangers move the heat into water instead — and water carries roughly three thousand times the heat of the same volume of air.

That shift is what makes high-density data centre cooling viable. But the cold plates and rear doors are only half of it. They perform only if water arrives at every rack at the right flow and the right pressure, which is the job of the header set feeding the floor.

Density

More compute per rack, per aisle, per hall. Liquid lets operators run high-density racks where an air-cooled hall would have to spread the load thin.

Energy

Water moves heat with far less parasitic power than air. Lower PUE, lower running cost, and chillers that can run warmer — or be shed.

Reuse & retrofit

Captured heat leaves as warm water that can be reused rather than dumped. And liquid can be brought into halls originally built for air, circuit by circuit.

We design, fabricate, test and install copper header sets across Australia's east coast — Melbourne, Sydney, Canberra and Brisbane — and connect them to the racks. One trade, one accountability, one set of drawings.

What we build

Header sets, built to the drawing

Every set is fabricated to the specific aisle, load and tie-in point. Nothing is a stock item.

01 / New build

Flow & return header sets

Matched flow and return mains with branch pairs on a set pitch, capped and prepared for connection to rack manifolds.

  • 50–200 mm main bore
  • Branch pairs to suit rack pitch
  • Capped and pressure-tested

02 / Non-standard

Custom configurations

Odd circuit counts, mixed bore, offset branches, tight ceiling voids, awkward tie-ins. Drawn in CAD, agreed before a single joint is brazed.

  • Any circuit count
  • Mixed-bore branch runs
  • CAD drawings supplied

03 / Existing halls

Retrofit & tie-in

Adding liquid to a hall that was built for air. Survey, design around what's already there, fabricate off-site, install in the window you've got.

  • Site survey and measure
  • Off-site fabrication
  • Staged cut-in and connection

How it runs

Supply. Install. Connect.

A sequence, not a menu. You can stop at supply — most clients don't.

Step 01

Supply

Design and fabrication from your layout or ours. Header sets arrive capped, labelled and hydrostatically tested, with drawings.

Step 02

Install

Set in place, supported, aligned and tied into the plant loop by the same people who fabricated it.

Step 03

Connect

Branch pairs run out and connected to the server boxes. Flushed, filled and pressure-proved on site.

Specification

The envelope

Standard capability. Outside these numbers, ask — most of it is a fabrication question, not a limit.

Main pipe bore50 mm – 200 mm — copper tube
Branch boreSized to circuit load. 50 mm typical.
Circuits per set4, 6 or 8 as standard. Custom counts on request.
ConfigurationFlow and return pairs, branch pitch to suit rack layout.
JoiningOxy-brazing and silver soldering.
TestingHydrostatic pressure test on every set. ✓ Certificate supplied
DocumentationCAD drawings and as-built dimensions issued with each set.
InstallationLicensed plumber and gasfitter. Install and connection across the east coast.
Lead timeIssued on enquiry
PricingIssued on enquiry

In-house

Everything under one roof

Design

CAD & drawings

Header sets modelled in Fusion 360 and signed off before fabrication starts.

Fabrication

Brazing & solder

Oxy-brazing and silver solder by a trade-qualified hand, not sub-contracted.

Assurance

Hydrostatic testing

Every set proved under pressure on the bench before it ships.

Site

Install & tie-in

Set, support, align and connect to the plant loop.

Site

Rack connection

Branch pairs run out and connected to the server boxes.

Licensing

Plumber & gasfitter

Licensed trade. Work handed over documented and compliant.

Enquiries

Tell us what you're cooling

Enquiries are read and answered by the person who builds the headers. Expect a reply within two business days.

No mailing list. No follow-up sequence. One reply, from a person.